NOTE: Doors using Floor Mount Door Guides will have a groove on the bottom. Ensure this groove is on the opposite end of the Door Hanger Installation.
A: Place the hanger on the top surface of the door, 2” from the edge of the door side and flush with the door front. Ensure the front of the hanger and the front of the door are facing the same direction.
NOTE: If the door is 3 or more inches thick, mount the hanger in the center between the front and back of the door.
B: Using a pencil, mark the screw hole placement on the door top.
Repeat steps A and B for the opposite end of the door
Drill two pilot holes for each hanger using an 1/8”bit (Figure 2).
Attach the hanger to the door using two fastener screws (provided). Repeat the process on the opposite end of the door.
Place the hanger on the top surface of the door, 2-3/4” from the edge of the door side and flush with the door front. Ensure the front of the hanger and the front of the door are facing the same direction.
A: NOTE: If the door is 3 or more inches thick, mount the hanger in the center between the front and back of the door.
B: Using a pencil, mark the screw hole placement on the door top.
Repeat steps A and B for the opposite end of the door
Drill two pilot holes for each hanger using an 1/8”bit (Figure 2).
Attach the hanger to the door using two fastener screws (provided). Repeat the process on the opposite end of the door.
First Things FirstCheck to see if the floor below the track area is level. If the floor rises more than 1/2” the door may rub or not slide open completely. If the floor is not level, measure from the highest point of the floor surface to the recommended track placement and adjust track placement accordingly.
Ensure the track will be installed onto wall studs. If wall studs are not lining up with the installation a header will be required to provide the necessary strength and stability for the track and door.
A: To determine where the track should be installed, first measure the height of the door, then add 2-1/4” to the door height. 1/2” of this total will be for the clearance between the bottom edge of the door and the floor. 1-5/8” will be from the top edge of the door to the center of the track.
D: Using a level and a pencil, make a line above the doorway the same length as the track.
E: Hold the track up to where the pencil line is visible through the holes in the track.
Suggestion: Use pieces of double stick tape on the back of the track to help hold the track in place while completing steps 2 and 3.
F: Mark an intersecting line in the center of each track hole.
Take the track down, remove double stick tape (if used) and set the track aside.
A: Drill out the marked holes using a drill with a 1/4” drill bit.
B: Attach one end of the track to the wall with one lag screw, and one washer (provided) using a socket wrench with 9/16” socket. Do not tighten.
E: Repeat step 7 for the other end of the track.
F: Install remaining lag screws and washers (provided) using a 9/16” socket wrench. Tighten all lag screws.
A: Hang the door.
B: With the door in the closed position, ensure the door is hanging straight using a bubble level.
C: Position the Door Guide part way into the groove in the bottom of the door.
Suggestion: Use double stick tape on the bottom of the door guide to hold the guide in place.
D: Install the Door Guide using a 1” phillips screw (provided) and a drill with a phillips bit.
E: Slide the door toward the open position until the other side of the Door Guide is exposed.
F: Install the second 1” phillips screw (provided) using a drill with a phillips bit.
A: Place the adjustable stop on your track.
B: Position along the length of your track to stop door at the desired location. Tighten bolt with a 9/16” wrench/socket.